Completed in 2017, ROC Development Group completely reconfigured and rebuilt this 20 unit apartment building. Additionally, a 20 car parking lot was added to the site for resident parking.
Completed in 2019, ROC Development Group reconfigured an illegal 8 unit building into 6 residential units. The property was rebuilt from the existing brick walls. Scope of work included: new roofs, new framing, 100% restoration of masonry, new drain tile sytems, water/sewer service upgrade, reinforcement of fire escapes, and a full rebuild of the interior.
Completed in 2018, ROC Development Group completely rebuilt this 4 unit apartment building. Scope of work included: Digging out the basement with new footings, drain tile system, new water/sewer service, new parking pad, new steel porches, and a complete rebuild of the interior.
Completed in 2018, ROC Development Group completely gutted this 3 unit building in Humboldt Park. Rebuilt from the inside out, our client was able to sell the property within a month of marketing.
Completed in 2016, ROC Development Group built this new construction 3 unit building featuring (2) 1800 square foot apartments plus a 1600 square foot retail space.